The renovation of the McKay Education Building at Weber State University demonstrates how an aging campus building can become a resilient, all-electric teaching environment. The project transforms the 63,500-square-foot, 1960s-era, four-story building into a student-centered environment that combines resource reuse with high-performing building systems, increased utilization with flexible learning environments, abundant daylight and views, and intuitive wayfinding to reinforce growth and lifelong learning.
McKay is home to a full continuum of learning, including university degree programs for future teachers, certification programs for practicing educators, the Melba S. Lehner Children’s School serving infants, toddlers and pre-K learners, and the WSU Charter Academy, which currently serves students from kindergarten to third grade. Balancing the needs of adult learners and young children requires distinct identities and separate spaces but preserving meaningful connections between them. The design establishes clearly defined entries, a secure Children’s School reception, and interior material palettes and graphics tailored and scaled to each audience. It creates separation without sacrificing programmatic relationships that enrich teacher training while providing clear circulation, visual connections and abundant daylight in both classrooms and shared spaces. Levels 0-1 accommodate both adult students and young learners while maintaining physical separation, visibility and ease of access.
The Children’s School functions as both an educational environment and a teaching laboratory. Observable classroom pairs support the development of teaching teams and connect to a secure, sloping playscape that links classrooms across both levels. Fully accessible outdoor spaces include a nature trail, infant and toddler play area, outdoor classroom, green space, sensory features, a ramp-and-slide pathway, big toys and a pump track. Level 1 also serves as the primary entrance for adult students, opening into a social learning commons connected to study niches, physical and digital maker spaces, and a daylit open stair linking the upper academic floors. These shared spaces encourage collaboration, resource creation and informal interaction throughout the building. Level 2 houses faculty offices, the Student Center, and conference and seminar spaces that reinforce a student-first culture. Faculty offices were intentionally moved away from the perimeter, allowing student collaboration spaces to occupy the building’s best daylight and views. The offices, in turn, borrow light through these shared spaces, while openings to Level 3 bring daylight deep into the central circulation spine from a clerestory above. Level 3 is dedicated to flexible classrooms with sweeping campus views and adjacent breakout spaces. Movable glass walls promote transparency and allow classrooms to expand or contract to support a variety of teaching modes. These adaptable learning environments mirror the collaborative K-12 classrooms that many students will encounter throughout their teaching careers.
Project Team
- Architect: GSBS Architects
- Interior Design: GSBS Architects
- Landscape Architecture: GSBS Architects
- Engineer — Civil: Ensign Engineering
- Engineer — Structural: ARW Engineers
- Engineer — Mechanical/Plumbing: Lynk Engineers (Colvin Engineering Associates)
- Engineer — Electrical: Electrical Consulting Engineers
- Kitchen Design Consultant: Jedrziewski Designs
- Cost Estimation Consultant: Cost Control Corp.
- Construction Manager/General Contractor: Okland Construction